5 Nautical Degrees

The ProcessPlimsoll Line

Every vessel follows a strict, measurable protocol — from assessment to launch.

01

Assessment

Inspection, damage recording and planning with a technical protocol. We understand the condition before we touch the surface.

02

Preparation

Sanding, cleaning, masking and surface preparation — 80% of the final result lies here.

03

Base Coat

Primer application under controlled temperature and humidity for maximum adhesion.

04

Finishing

Topcoat, polishing and detailing — the moment the surface becomes a mirror.

05

Delivery

Final quality control — the project returns with measurable quality and durability.

Let’s start with the assessment

Contact